Public Projects

Bidding Closed
3/18/25 11:00am
"EQUIPMENT PURCHASE" Eureka Middle School Roof Top Unit Package Phase II
Bidding Closed
BASe2 Group
Eureka IL Middle School
WORK consists generally of the sale of equipment. Provide RTU submittal and lead time for the RTU’s in the bid package. Delivery of equipment in this bid package is expected by Friday June 13th, 2025.
Bidding Closed
3/13/25 3:00pm
24043 M7079 MORTON CUSD 709 2025 MAINTENANCE & H.S. EAST GYM RENOVATION
Bidding Closed
Keach Architectural Design
High School Bertha Frank Auditorium (Morton, IL 61550)
The scope of the Project is defined by the Contract Documents and generally consists of several miscellaneous maintenance projects at various schools including: Roof Replacement/Recovery at two schools, renovation of the High School East gym that consists of athletic wood floors, painting, bleachers, athletic equipment, lighting replacement, and door replacement, and misc. renovations at three grade schools consisting of athletic wood floors, door replacements, single room renovation, and toilet room renovation.
Bidding Closed
3/3/25 1:00pm
24033 PCHS 303 Building G Science Lab Renovations
Bidding Closed
Keach Architectural Design
320 Stadium Drive, Pekin, IL 61554
The scope of the Project is defined by the Contract Documents and generally consists of the renovation of 11 Classrooms into Science Lab Classrooms, including 5 supporting prep rooms. Work will be broken into Multiple Prime Contracts as follows; General, Plumbing, Mechanical, and Electrical.
Bidding Closed
11/13/24 2:00pm
Limestone Community High School CHSD 310 RTU AND EXHAUST FAN REPLACEMENT
Bidding Closed
Keach Architectural Design
4201 Airport Road, Bartonville, IL 61607
The scope of the Project is defined by the Contract Documents and generally consists of but not limited to a roof recovery of an existing built up asphalt roof with a single ply membrane roof with associated accessories, flashing, and trims. Limited mechanical and electrical work for roof top equipment, exhaust fans, and penetrations is expected to facilitate roof recovery.
Bidding Closed
11/13/24 2:00pm
Limestone Community High School CHSD 310 Roof Replacement
Bidding Closed
Keach Architectural Design
4201 Airport Road, Bartonville, IL 61607
The scope of the Project is defined by the Contract Documents and generally consists of but not limited to a roof recovery of an existing built up asphalt roof with a single ply membrane roof with associated accessories, flashing, and trims. Limited mechanical and electrical work for roof top equipment, exhaust fans, and penetrations is expected to facilitate roof recovery.
Bidding Closed
12/6/24 10:00am
Vespasian Warner Public Library HVAC Renovation
Bidding Closed
ENTEC
Vespasian Warner Public Library (Clinton, IL)
The scope of this project consists of the demolition, removal, and installation of all equipment to provide a comprehensive replacement of the existing heating, ventilation, and air conditioning (HVAC) system.
Bidding Closed
9/24/24 2:00pm
24014 The Salvation Army Labor Temple Demo
Bidding Closed
Keach Architectural Design
400 NE Jefferson Ave, Peoria, IL 61603
The scope of the project is defined by the Contract Documents and consists of the removal of the existing (5) five story, load bearing clay masonry structure located at 400 NE Jefferson in its entirety including the basement and foundations. The work also includes site work associated with the removal of the building. The site work is compromised of, but not limited to, erosion control, sidewalk removal and replacement, pavement removal, utility removal/cap, earthwork/grading, and seeding.
Bidding Closed
8/6/24 2:00pm
VOM GAS & WATER STORAGE BUILDINGS
Bidding Closed
Keach Architectural Design
VILLAGE OF MORTON 445 E. Birchwood St. Morton, IL 61550
The scope of this Project is defined by the Contract Documents and generally consists of but not limited to the renovation of the existing storage building and partially enclosing of the (2) existing material storage bins.
Bidding Closed
5/23/24 2:00pm
24004 BRIMFIELD CUSD 309 BRIMFIELD GRADE SCHOOL OFFICE RENOVATION
Bidding Closed
Keach Architectural Design
216 E. Clinton St. Brimfield, IL 61517
The scope of the Project is defined by the Contract Documents and generally consists of the renovation of the existing classroom and office space create individual offices, teachers’ lounge, conference room, and classroom. Work includes drywall partitions, acoustic ceilings, flooring, aluminum window/entrances, renovated toilet rooms, VRF expansion, and electrical systems.
Bidding Closed
5/14/24 3:00pm
24010 RANKIN SCHOOL DISTRICT 98 PARKING LOT IMPROVEMENTS
Bidding Closed
Keach Architectural Design
13716 5th Street Pekin, IL 61554
The scope of the Project is defined by the Contract Documents and generally consists of but not limited to full-depth pavement removal and replacement of Rebel Drive from the entrance on 5th Street, along the south side of the building, and extending to the west edge of the basketball court. The work will also include some smaller features such as a new concrete entrance at the “recess doors”, decorative rock mulch in the inset alongside the entry, removal of abandoned bollards/concrete, installation of steel bollards around the light pole (near corner of the removed building), and paint pavement markings. The project also includes three alternate bids that expands the paving scope of work to other parts of the site.