24043 M7079 MORTON CUSD 709 2025 MAINTENANCE & H.S. EAST GYM RENOVATION

The scope of the Project is defined by the Contract Documents and generally consists of several miscellaneous maintenance projects at various schools including: Roof Replacement/Recovery at two schools, renovation of the High School East gym that consists of athletic wood floors, painting, bleachers, athletic equipment, lighting replacement, and door replacement, and misc. renovations at three grade schools consisting of athletic wood floors, door replacements, single room renovation, and toilet room renovation.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
24043_009101_AD1 228.2 KB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
24043_009102_AD2 11.6 MB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
24043_009103_AD3 79.8 KB